Objective: 1400 guests and a 600 park rating by the end of year 3.
1.I put a fee of 25 dollars to get into the park.
2.First I put a non-rollercoaster, non water ride into the park with a 6 week advertising campaign on the park and on the ride
2a.Then when the advertising campaing was almost over I put a rollercoaster ride or a water ride into the park with a 6 week advertising campaign on the park and on the ride
2b.I did my best to repeate this throught the whole three years with only one ride every 6 weeks!!!
3.Durring the second advertising campaign and the rest of the other advertising campaigns I added sectioned off workers where needed
3a. I did not need a cop or a entertainer is this level
4.Durring the second and rest of the avertising campaigns I added shops, and stalls when needed
4a. I also added some benches and wastepaper baskets over time that need attention if they are vandalized
Notes: Build small rollercoaster and water rides and buy land when are
where needed<./P>