Objective: 1600 guests and a 600 park rating by the end of year 3.
1.I raised the fee to 25 dollars to get into the park.
2.First I put a non-rollercoaster, non water ride into the park with a 6 week advertising campaign on the park and on the ride
2a.Then when the advertising campaing was almost over I waited a week to three before a rollercoaster ride or a water ride into the park with a 6 week advertising campaign on the park and on the ride.
2b.I repeated this throught the whole three years with only one ride every 7 to 9 weeks!!!
3.Durring the second advertising campaign and the rest of the other advertising campaigns I added sectioned off workers where needed
3a. I did not need a cop or a entertainer is this level
4.Durring the second and rest of the avertising campaigns I added shops, and stalls when needed
4a. I also added some benches and wastepaper baskets over time that need attention if they are vandalized
notes for this scernario:
Build small rollercoasters, water rides, go-kart tracks. There is not
a lot of room to work with and you need all the space you can get.