Objective: 1500 guests and a 600 park rating by the end of year 3.
1.I raused the park entrance fee to 25 dollars.
2.First I put a non-rollercoaster, non water ride into the park with a 6 week advertising campaign on the park and on the ride
3a. To save space and waste time I put an advertising campaign on one opf the rides that was already there at the start of the scernario. 3 to 4 weeks should do it.
3b.Then when that advertising campaing was almost over I did my best to switch and build a rollercoaster ride or a water ride into the park with a 6 week advertising campaign on the park and on the ride
3c.I repeated this throught the whole three years with only one new ride every 9 weeks!!!
4.Durring the second advertising campaign and the rest of the other advertising campaigns I added sectioned off workers where needed
4a. I did not need a cop or a entertainer is this level
5.Durring the second and rest of the avertising campaigns I added shops, and stalls when needed
5a. I also added some benches and wastepaper baskets over time that need attention if they are vandalized
notes:
Stuff rides and build small rollercoaster or water rides. There is not
alot of space to build on so if rides go through one another, it will be
good.