Hydro Hills Help Page

Objective: 20,000 park value by the end ofyear 3.

1.Start your scenario with about $15 fee. It will prompt you often to raise this fee. Raise it $2 or $3 at a time. The object is to get a high park value $20K. Advertise for park when you see total people in park going down fast. More people, more rides you can afford. More rides, more value.

 2 This scenario has 3 large lakes in it. Don't try to go beyond 2 lakes to beat the scenario. Use 2 separate trains for 1st and 2nd lake. 2 stations at 1st one, 1 station loop at 2nd one (smaller lake and less track)

3. Max out your money in research for everything but theming and improvements. Drop shops and gentle rides when you have enough choices. Replace shops and gentle rides when they quit producing.

4. Water rides are very important in this scenario, and are easier to build than roller coaster rides. Pace the ride additions, so custom designing works great here. You get more bang for your buck, unless you make a lot of mistakes. Save often, and then go back and delete earlier versions. Meanwhile, don't let your park fall to pieces. Stop often and inspect.

5. To determine maximum amount to charge a particular ride, set a low price at first, then let Que line fill up, and gradually increase it to maintain half or more Que full. Build long entrance Ques, short ones kicks people who want to ride it. Shorten exit ques. Do that with new and existing rides (I don't believe there are existing ones in this scenario however).

6. During the second advertising campaign and the rest of the other advertising campaigns add workers where needed to accomodate the additional loads.

7. Only 1 security and no entertainer required in this level

8. During the second and rest of the avertising campaigns ad shops,and stalls when needed.

9. Add some benches and litter cans over time, inspect often to eliminate the effects of vandalism (improves Park Value).

10. If time is running low (about 1 month to go) and you have not yet met the goal, just add a extra rollercoaster or two that will increase the parkvalue very fast. You should not have to do this. Try to get $22K or $23K minimum by September year 3.


Back To The NewHints And Tips Page