Objective: 1100 guests and a 600 park rating by the end of year 2.
1.I tried the same special thing do to time constraints with this scernario and it worked with a minor change for this level:
2.I raised the fee to 25 dollars to get into the park.
3.First I put a non-rollercoaster, non water ride into the park with a 6 week advertising campaign on the park and on the ride
3a.Then when the advertising campaing was almost over I put a rollercoaster ride or a water ride into the park with a 6 week advertising campaign on the park and on the ride
3b.I repeated this throught the whole two years with only one ride every 6 weeks!!!
4.During the first advertising campaign and other early advertising campaings I deleated some parts of the paths so the peeps wont get lost.
5.Durring the second advertising campaign and the rest of the other advertising campaigns I added sectioned off workers where needed
5a. I did not need a cop or a entertainer is this level
6.Durring the second and rest of the avertising campaigns I added shops, and stalls when needed
6a. I also added some benches and wastepaper baskets over time that need attention if they are vandalized
7.I ended up with like 50 percent of the park free to build more stuff