Objective: 1200 guests and a 600 park rating by the end of year 3.
1.I put a fee of 25 dollars to get into the park.
2.First I put a non-rollercoaster, non water ride into the park with a 6 week advertising campaign on the park and on the ride
2a.Then when the advertising campaing was almost over I put a rollercoaster ride or a water ride into the park with a 6 week advertising campaign on the park and on the ride
2b.I repeated this throught the whole three years with only one ride every 6 weeks!!!
3.Durring the second advertising campaign and the rest of the other advertising campaigns I added sectioned off workers where needed
3a. I did not need a cop or a entertainer is this level
4.Durring the second and rest of the avertising campaigns I added shops, and stalls when needed
4a. I also added some benches and wastepaper baskets over time that need attention if they are vandalized
Notes on this scernario:
If you build down to the bottom of the canyon to put in some rides you sould put in the path first then the ride to make it easier.
It would be better to build the rides down like only three or four height units below the bridge connecting the two sides of the canyon so that they will be buildable.
One last thing. Think small rollercoaster rides.