Objective: 1400 guests and a 600 park rating by the end of year 3.
1.I put a fee of 25 dollars to get into the park.
2.First I put a non-rollercoaster, non water ride into the park with a 6 week advertising campaign on the park and on the ride
2a.Then when the advertising campaing was almost over I put a rollercoaster ride or a water ride into the park with a 6 week advertising campaign on the park and on the ride
2b.I did my best to repeat this throught the whole three years with only one ride every 6 weeks!!!
3.Durring the second advertising campaign and the rest of the other advertising campaigns I added sectioned off workers where needed
3a. I did not need a cop or a entertainer is this level
4.Durring the second and rest of the avertising campaigns I added shops, and stalls when needed
4a. I also added some benches and wastepaper baskets over time that need attention if they are vandalized
notes:
I put the non rollercoaster rides where the water level was highest and put the rollercoaster and water rides going on the other side. It worked for me.
Use small to medium rollercoaster or water rides for this park.